Saturday, March 22, 2014

Steinway A #280251 Bridge work

After the proper thickness is determined, the bridge tops are planed, and sanded smooth. The bridge pin hole locations are placed on the new top using the patterns made earlier. Then the holes are drilled, the top dyed black, and the bridge is notched. Finally the new pins are installed.

1 comment: