The past weeks I have accomplished a fair amount of work on the Steinway. The bridges are capped, and the soundboard is pressed. Today I set the bearing on the bridge tops. The pictures tell most of the story.
Subscribe to:
Post Comments (Atom)
What's happening at 200 W. Allen St. and beyond. Call 717-697-4111
No comments:
Post a Comment