Wednesday, February 24, 2010
Harp Shell Progress.
The base and the cap for the shell have been fitted in preparation for permanent installation. Six blocks were installed on the staves to add additional strength to the base of the shell. The fitting of the base and cap was rather interesting because of the multiple angles required. Epoxie will be used for the installation as it will provide good strength and gap filling ability.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment